The installation requirements for the vulcanizing machine of the cement plant conveyor belt are as follows:
Installation location selection: Find a spacious area on the installation line of the belt conveyor. It should not only ensure a certain operating area and space, but also have a place to place the belt and convenient power connection. Meanwhile, if the on-site environment is dusty or rainy, a construction shed should be set up to ensure the construction quality.
Operation platform construction: Disassemble several sets of upper idlers on the belt conveyor installation line and build an operation platform with square timbers to facilitate the installation of the vulcanizing machine and the operation of the conveyor belt joints.
Placement and alignment of vulcanizing machine components
The placement of the lower frame should align the ends, and the center line of the frame should be aligned with the center line of the conveyor belt. Then place the water pressure plate, the pressure transmission plate and the lower vulcanization plate. The placement of the vulcanization plate is based on the centerline of its working surface and aligned with the centerline of the conveyor belt.
After the bonding part of the conveyor belt is fabricated according to the process, use retaining irons to clamp both sides of the bonding part.
Then, place the vulcanized plate, the water pressure plate and the heat insulation plate in sequence, and then place the frame. All of them are required to align the centerline of their working surfaces with the centerline of the conveyor belt, install connecting bolts, and tighten them one by one.
Connection and inspection: After the vulcanizing machine is tightened, connect the high-pressure water pipe, the wire plug and the pressure pump respectively. Before the formal vulcanization, conduct a thorough inspection of each component. Only after confirming that there are no issues can subsequent operations be carried out.